TRACO News
41th INTERNATIONAL CONGRESS ON HEATING, REFRIGERATING AND AIR - CONDITIONING will be held from 01.12.2010. - 03.12.2010.in Belgrade Sava Center. We invite you to visit our stand number 46 and 47 located on the ground floor (next to the INFO desk).
REFERENCE LIST 2000-2009.
In the period of 2000-2007. Company "TRACO" LLC successfully built thermo-technical installations on several hundreds of buildings in the country and abroad of which:
Year 2000.
- Residential settlement "Denkova basta", 120 apartments, fabrication of installations for heating and ventilation, buildings C1, C2 and C3.
- VMA Military medical academy - reconstruction of installations of distribution of steam and condensates
- Sport hall in Vrsac: Fabrication of heat-transmitting sub-station
- Primary and secondary hot water pipeline and heat-transmitting sub-station of heating power 3 MW in Lazarevac
Year 2001.
- Residential building in Dobropoljska Street in Belgrade, thermo-technical and hydro-technical installations
- Residential building in Sibinjanin Janka Street, 35 apartments, fabrication of electro-technical installations
- Residential building in Veljka Dugosevica Street in Belgrade, thermo-technical installations.
- Boiler room in Kostunici, thermo-technical, hydro-technical and electro-technical installations.
- Management building and manufacture building in Baćevac - thermo-technical installations.
- Boiler-room and hot water pipeline in Baćevac - thermo-technical installations.
Year 2002.
- Residential settlement "Denkova basta", fabrication of installations of heating and ventilation, buildings C4 and C5.
- Main exchanging station "Topčider", fabrication of sub-station.
- Thermo-technical and hydro-technical installations of the "Autokomerc" building in Belgrade.
- Thermo-technical installations of the building for residence of the soldiers KN 54 - Military barracks "Dedinje"
Year 2003.
- Residential settlement "Denkova basta", fabrication of installations for heating and ventilation, buildings B13 and B14.
- Thermo-technical installations of residential building H-3 in Belgrade, Ustanicka Street
- Sub-stations in the buildings KN 54 and KN 55 of the military barracks "Dedinje"
- Thermo-technical and hydro-technical installations of residential - business building in Lazarevac.
- Fabrication of secondary hot water pipeline in the military barracks "Topcider"
- Kostunici - fabrication of hot water pipeline boiler-room
- JP "Suboticka toplana" - delivery and mounting of thermal sub-stations
Year 2004.
- Residential settlement "Denkova basta", fabrication of installations for heating and ventilation, buildings B7, B8, B9 and B10.
- Installations of cooling, ventilation and air-conditioning - "IMLEK", Padinska Skela
- Installations of radiator heating and fabrication of thermal sub-station, Kapetan Misina Street, no. 9-11, Belgrade
- Installations of heating, ventilation and fabrication of thermal sub-station in branch offices of EKSIM BANK in Paraćin and Novi Sad
- Fabrication of secondary hot water pipeline in the military barracks "Topčider"
- Fabrication of primary hot water pipeline and thermal sub-station in residential buildings in Pozarevac
- JP "Subotička toplana" - delivery and mounting of thermal sub-station
- Residential building Botičeva, Belgrade - Thermo-technical installations
Year 2005.
- Clinical Center of Serbia - delivery and mounting of packaged sub-stations
- Residential building, Bačvanska, Belgrade - reconstruction of boiler-room
- KO Koče Kapetana Street, KO Kumodraska Street - delivery and installation of the equipment and sub-stations initiation
- Building VP 2130, Belgrade - reconstruction of boiler-room
- Residential building Dalmatinska Street, Belgrade - fabrication of thermo-technical installation.
- TPS Pozarevac - fabrication of mechanical installations.
- Institute of rheumatology, Belgrade - reconstruction of the installation of radiator heating
- Faculty of pedagogy, Belgrade - fabrication of thermal sub-station
- Hospital, Sremska Mitrovica - fabrication of thermo-technical installations
Year 2006.
- JKP Beogradske elektrane- fabrication and installation of compact transmitting sub-stations for heating and preparation of PTV on heating area TO DUNAV
- Clinical Center of Serbia, Belgrade - delivery of packaged sub-stations for heating and preparation of PTV
- JP Toplifikacija Pozarevac - fabrication of thermal-transmitting sub-stations
- JP Subotička toplana - delivery of packaged heating sub-stations
- Clinical Center of Novi Sad - reconstruction of power-plant for preparation of PTV
- Vinča Institute - fabrication of thermo-technical installations
- Military institute Dedinje - reconstruction of the power-plant for preparation of PTV
- Bambi Pozarevac - fabrication of installations of central heating, air-condition and ventilation
- Faculty of pedagogy, Belgrade - fabrication of thermo-technical installations
- GSP Beograd - fabrication of installation of condensed air in the plant GSP Kosmaj
Year 2007.
- Economic Bank Beograd, Belgrade - Installations of heating, cooling and ventilation. Branch offices: Pozarevac, Sabac, Leskovac, Jagodina, Krusevac, Kragujevac, Gornji Milanovac, Paraćin, Novi Pazar, Nis, Zaječar, Novi Beograd (ENJUB)
- JKP Beogradske elektrane, Belgrade - disassembling of existing, fabrication, delivery and mounting of thermal-transmitting sub-stations on the location TO Dunav.
- JP Subotićka toplana, Subotica - fabrication and delivery of packaged thermal-transmitting sub-stations - I phase 33 sub-stations
- JP Toplifikacija, Pozarevac - fabrication of thermal-transmitting sub-stations and secondary hot water pipelines
- Postanska stedionica, Belgrade - fabrication of installations of heating, cooling and ventilation
- Clinical center of Serbia, Belgrade- delivery of packaged sub-stations for heating and preparation of PTV
- Delta auto, Belgrade - reconstruction of thermal-transmitting sub-stations
Year 2008.
- "JP Suboticka toplana", Subotica - Compact, packet heating substation production and delivery - II phase, 47 units
- "Autokomerc AUDI" center Surcin - HVAC Instalation
- "Mercedes-Benz" Novi Beograd - Fan-coil Instalation
- Housing-bussiness object, Milana Rakica street, Beograd - HV Instalation
- "Oil Refinery Belgrade" - Ventilation system
- "Vinca" Institute - Laboratorija za fiziku - HVAC Instalation installments
- "Department of Pharmacy" - Novi Sad - Heating substation
- "Clinical Center Vojvodina" - Novi Sad - Domestic hot water instalation
- "Alumil", Cacak - Floor heating, conditioning, ventilation system instalation
- "Ufar", Beograd - HVAC Instalation - Pharmaceutical plant in Barajevo
- "JP Toplifikacija", Pozarevac - Heating substation, heating pipeline instalation
- "Toplana Loznica" - Heating substation
Year 2009.
- "Autokomerc center" - Nis - HVAC Instalation
- "JKP Beogradske elektrane" - Compact, packet heating substation production and delivery (85 units)
- "Geze", Zrenjanin - Boiler house, heating pipeline, substation and HVAC instalation
- "JP Suboticka toplana", Subotica - Compact, home packet heating substation production and delivery - 100 units
- "Projektomontaza", Beograd - HVAC Instalation - VERANO BLOK 23 N.Beograd
